Project
Carina Bend environmental watering.
Location
Situated 18Km from Wemen in the Wemen Nature conservation reserve is a large wetland capable of holding up to 800ML.
Requirements
To deliver 800ML of environmental water from the Murray River to Carina Bend Wetland.
Services Provided
- Designing of a detailed system to specific site conditions.
- Coordination of traffic management plan.
- Coordination of construction of earthworks.
- Designing a safety management plan.
- Monitoring of wetlands.
Equipment Used
- 1 : 90 degree elbow.
- 2: 4 meter rubber flex on delivery.
- 1: 12 inch centrifugal pump.
- 1: 600 liter diesel tank fully double bunded.
- 18 meters of 12 inch suction line with filter.
- 6 meter x 6 meter square of geofabric to minimize soil erosion and environmental impact.
- 1: 12 inch flute slowing the speed of water to reduce erosion and environmental impact.
- 1 Siemens water meter capable of reading megalitres per day and total megs pumped.
- 80 meters of the delivery line.
- 1 Adcon telemetry unit giving real time monitoring with data logging back to a hosted website shared with clients.