Vinifera environmental water delivery.

Location

Situated 5KM from Vinifera in the Nyah Vinifera Forrest is a large wetland capable of holding up to 1100ML.

Requirements

To deliver 1100 ML of environmental water from the Murray River to Vinifera Wetland.

Services Provided

Services Provided here

Equipment Used

  • 1 : 12 inch centrifugal pump
  • 1 : 45 degree elbow
  • 1: 1000 liter bulk fuel tank fully double bunded
  • 22 meters of 12 inch suction line with filter
  • 1 Siemens water meter
  • 120 meters of 12 inch delivery line
  • 1: 12 inch flute to minimize soil erosion and environ­mental impact
  • 1: 6 meter x 6 meter square of geofabric to minimize soil erosion and environmental impact
  • 1 Adcon telemetry unit giving real time monitoring with data logging back to a hosted website
  • Services provided: site inspection with Mallee CMA staff discussing any cultural heritage issues and any other en­vironmental considerations
  • Coordination of traffic management plan
  • Coordination of earthworks
  • Designing a safety management plan
  • Monitoring of wetlands
  • Refueling, service and maintenance of pumps