Project

Wallpolla East environmental water delivery.

Location

Wallpolla Island.

Requirements

To deliver 1OOOML of environmental water from the Murray River to Wallpolla East Wetland.

Services Provided

  • Designing of a detailed system to specific site conditions.
  • Site inspection with Mallee CMA staff discussing any culĀ­tural heritage issues and any other environmental considĀ­erations.
  • Coordination of traffic management plan.
  • Coordination of construction of earthworks.
  • Designing a safety management plan.
  • Monitoring of wetlands.
  • Refueling, servicing and maintenance of pumps.
  • Regulation of flows to suit timelines.

Equipment Used

  • 1 : 12 inch pump.
  • 1 : 600 liter diesel tank fully bunded.
  • 1 Siemmens water meter.
  • 27 meters of 12 inch suction line.
  • 1 suction manifold and pipes.
  • 150 meters of 12 inch delivery line.
  • 1: 12 inch flute to minimize soil erosion and environmental impact.
  • 1 : 6 meter x 6 meter geofabric to minimize soil erosion and environmental impact.
  • 1 Adcon telemetry unit giving real-time monitoring with data logging back to a hosted website.