Project

Wallpolla East environmental water delivery

Location

Wallpolla Island

Requirements

To deliver 1OOOML of environmental water from the Murray River to Wallpolla East Wetland

Services Provided

  • Designing of a detailed system to specific site conditions
  • Site inspection with Mallee CMA staff discussing any culĀ­tural heritage issues and any other environmental considĀ­erations
  • Coordination of traffic management plan
  • Coordination of construction of earthworks
  • Designing a safety management plan
  • Monitoring of wetlands
  • Refueling, servicing and maintenance of pumps
  • Regulation of flows to suit timelines

Equipment Used

  • 1: 12 inch pump
  • 1: 600 liter diesel tank fully bunded
  • 1 Siemmens water meter
  • 27 meters of 12 inch suction line
  • 1 suction manifold and pipes
  • 150 meters of 12 inch delivery line
  • 1: 12 inch flute to minimize soil erosion and environmental impact
  • 1 : 6 meter x 6 meter geofabric to minimize soil erosion and environmental impact
  • 1 Adcon telemetry unit giving real-time monitoring with data logging back to a hosted website