Project
Wallpolla East environmental water delivery
Location
Wallpolla Island
Requirements
To deliver 1OOOML of environmental water from the Murray River to Wallpolla East Wetland
Services Provided
- Designing of a detailed system to specific site conditions
- Site inspection with Mallee CMA staff discussing any culĀtural heritage issues and any other environmental considĀerations
- Coordination of traffic management plan
- Coordination of construction of earthworks
- Designing a safety management plan
- Monitoring of wetlands
- Refueling, servicing and maintenance of pumps
- Regulation of flows to suit timelines
Equipment Used
- 1: 12 inch pump
- 1: 600 liter diesel tank fully bunded
- 1 Siemmens water meter
- 27 meters of 12 inch suction line
- 1 suction manifold and pipes
- 150 meters of 12 inch delivery line
- 1: 12 inch flute to minimize soil erosion and environmental impact
- 1 : 6 meter x 6 meter geofabric to minimize soil erosion and environmental impact
- 1 Adcon telemetry unit giving real-time monitoring with data logging back to a hosted website